3.25 MW POWER READY INDUSTRIAL SITE

12 Acres of Industrial Land Offered at $1,625,000 USD in Tioga, PA 16946

Date Added:
May 17, 2024
Days on Market:
28 days

Asking Price $1,625,000

Property Type
Land, Industrial

Listing Contacts

Marco Muoio
Marco Muoio
Verified Profile
  • Property Info

Property Overview

HEAVY POWER SITE FOR INDUSTRIAL, MANUFACTURING & BITCOIN MINING - TURNKEY & POWER READY!!
Former Georgia-Pacific processing facility. Currently being operated as a bitcoin mining site with 2.25 MW of 3.25 MW energized. Transformers on for all 3.25 MW are on site and included in the sale. Estimated power cost is $0.045 KWH, billed as actual.
POWER-LOAD CAPACITY EXPANSION:
Fully Approved by FirstEnergy (Penn Electric) for 100 MW. Transmission Load Study has been completed. Utility Substation is 1.4 miles away. Utility will bring 115kV high-voltage line to the site. Utility has no must-takes, power billed as actual. PA is deregulated therefore power blocks can be purchased on open market. Estimated power cost is $0.045 KWH - contracted capacity will directly impact power cost.

Highlights

  • 3.25 MW OF IN-PLACE POWER CAPACITY (2.25 MW ENERGIZED)
  • 12 AC OF HEAVY INDUSTRIAL ZONED LAND with LARGE POURED SLAB AREA
  • APPROVED FOR 100 MW OF POWER CAPACITY EXPANSION
  • TRANSMISSION LOAD STUDY COMPLETED BY FIRST ENERGY
  • IDEAL BITCOIN MINING // HOSTING SITE – UTILITY APPROVED

FAQ

How do I add a non-forward facing team member such as a broker coordinator or broker aide to a listing in order to ensure they get notifications on the property?
Please email our support team at [email protected] and they will add the team member.
How do I access a private listing?
Please contact the broker directly with the information provided on the listing. Once the broker approves your credentials he will make the information public to you.
How can I contact the broker
We strongly encourage to message the broker through our portal by clicking on the “Envelope” icon next to the brokers photo on the property page. We’ve found brokers response time is much quicker via our messaging portal than phone as brokers are always on the go.
What is the difference between Tier 1 & Tier 2 in the Due Diligence Vault?
Documents that are placed in a Tier-1 Due Diligence vault require the execution of a Confidentiality Agreement (“CA”) for access. Documents and folders placed in the Tier-2 vault are intended to have an added layer of security and require the execution of a CA in addition to required Broker approval for access.
How do I unsubscribe from emails?
At the footer of each email you will find links to Reduce Email Frequency, Adjust Email Settings or Unsubscribe altogether. If you choose to Unsubscribe and are still receiving emails please reach out to us at [email protected].